Cut-off and culvert construction retention basin Beegden
Project description
As a response to the flooding of the Meuse it has been decided to build a retention basin. The main goal is to give the Meuse more space when extreme conditions occur (Commission Boertien). As such MH Poly designed the culvert construction at Sleijbeek in the embankment in the area of Nederhoven and Pannenhof. These designs have been elaborated to execution level. Furthermore the design of the cut off construction in the quay at Beegden-North-East is prepared towards execution level.
Project activities
- Making of overview drawings;
- Drawings of the shape and dimensions of the reinforcement drawings including the calculations.
Locatie
Beegden, the Netherlands
Opdrachtgever
Van den Biggelaar construction company