Project - Certifying soil transportation ‘Room for River’-project groyne lowering Waal, phase II

Certifying soil transportation ‘Room for River’-project groyne lowering Waal, phase II


 

Certifying soil transportation 'Room for River'-project groyne lowering Waal, phase II

Project description

MH Poly has certified soils which has been excavated for the project “Groyne lowering, Waal river phase 2” in order to make reuse possible. In this project 120 groynes have been lowered. For this project batches of ground have been tested on environmental and civil engineering aspects in accordance with SIKB protocol 9335-1 and SIKB protocol 9335-9. Both protocols are part of the national assessment guideline for the KOMO® product certificate and the NL BSB® product certificate for soil.

After the soils were released they have been checked and reused in the project “Mounds in the Room for River project Overdiepsche polder” in accordance with the act for quality of soil reuse “Besluit bodemkwaliteit afgezet in grondwerken elders”.

Project activities

- Project certifying BRL 9335, protocol 1 and protocol 9;
- Assaying individual batches soil in accordance with protocol 1001;
- Keeping up soil transportation administration BRL 9335;
- Providing KOMO® product certificates with soil transports.