MH Poly Consultants & Engineers

MH Poly Consultants & Engineers

Teamwork is a fundamental pillar of MH Poly Consultants & Engineers bv. The story of our company begins in 2008, with the fusion of MH Nederland B.V. located at Zwijndrecht and engineering firm Poly Construction B.V. from Bergen op Zoom.

Together we are even more capable of providing the best tailor-made solutions for various and complex issues. It’s a two-for-one deal: the long-standing knowledge and experience of two renowned companies under one roof.

MH Nederland milieu & infrastructuur (environment & infrastructure)

MH Nederland was founded in 1987. It was an independent consultancy firm, specialized in high-quality services regarding environment and infrastructure. They were experts when it came to:

  • Preparation of new infra, road reconstructions and redesign
  • Soil and ground water investigations
  • Dyke reinforcement projects
  • Sluice constructions

Ingenieursbureau Poly Construction B.V. (IPC)

Poly Construction was an independent engineering firm. Since its start in 1988 the company was concerned with project support in the field of mechanical engineering and civil engineering. This support consisted of designing, calculating and drawing various contructions and hydraulic engineering structures.

Project categories:

  • Mechanical engineering projects, such as steel construction and piping
  • Infra and civil engineering projects
  • Innovative projects

International Projects

Watertight structure Mölndalsån – E05 Korsvägen

International

Engineering and supervision L-Jetty

International

Immersion of Caissons as foundation for the Çanakkale 1915-bridge in Turkey

International

GWW Magazine: The longest suspension bridge in the world: Canakkale 1915

International

Cofferdam that connects existing quay wall in the Scheldt, Antwerp (Belgium)

International

Ship lock Sodertalje Sweden

Ship Lock at Södertälje, Sweden

International

MOSE project: Design immersion pontoon for storm surge barrier in Venice

International

Immersed tunnel in Santos, Brazil

International

Ship sluice design ‘De Blauwe As’ at Assen, the Netherlands

International

Design of a shipyard, Venezuela

International

Raz Blanchard: Mooring system for floating tidal energy turbines

International

MOSE project: Dry habitat for constructional under water work

International

Marieholm Tunnel Göteborg – ‘Immersed Tunnel design’

International

Mooring buoy anchoring system

International

Design diving habitat for gas pipeline repair in the Java Sea

International

Hydraulic engineering – Coast, rivers and dredging

International

Design Lock ‘Havenkwartier Assen’

International

Jacking operation bridge Limmel in Maastricht, the Netherlands

International

Pressure vessel design for Duiker Combustion Engineers

International

Hydraulic single winch drum 180kN and 650kN

International

AQUA-Shell: a special technique for the construction of quay wall capping beams

International

Immersion Aqueduct N31, Leeuwarden Netherlands

International

The Söderströmstunneln; An immersed tunnel in the heart of the centre of Stockholm

International

Expansions of the mooring areas of the port of Constanta, Romania

International

Immersed tunnel design Hong Kong – Zhuhai – Macau Fixed Link project

International

Preliminary waterbed investigation and remediation plan Beneden-IJssel, Netherlands

International

Combination MH Poly – GEO2: consultants and supervisors site preparation Waterrijk in Boskoop

International

Checking calculations of roller fairleads

International

Certifying soil transportation groyne lowering Waal, phase III

International

Temporarily lifting facility for the crane vessel ‘Thialf’

International

Habitat to repair a GINA profile, South Korea

International

Study slipway Mombasa, Kenya

International

Slackening structure and mooring post for the second Julianasluis at Gouda

International

Re-calculation slipway Santiago de Cuba

International

Oil Terminal Constanta, Romania

International

Certifying soil transportation ‘Room for River’-project groyne lowering Waal, phase II

International

Double lift gate unit with a sliding gate for the overfall at Saint Martin

International

afzinktunnel

Busan-Geoje Fixed Link, Korea

International

Habitat for a slipway renovation at Galati, Romania

International

(Temporarily) relocating mooring locations Houthaven, Amsterdam

International

Cut-off and culvert construction retention basin Beegden

International

Cruise terminal Benoa, Bali

International

North-South Line Central Station, Amsterdam

International

Design of a fish friendly p-trap

International

Preliminary investigation of the waterbed at the Brabantse and Sliedrechtse Biesbosch

International